
|
FPST 3733 Sprinkler System Design for High-Piled and Rack Storage Fees| OSU Fees | $9.75 | | Postage/Handling Outside Continental U.S. | $55.00 | | Postage/Handling Continental U.S. | $15.00 | | Administrative Fee | $30.00 | | Course Extension Fee | $105.00 | | Course Transfer Fee | $25.00 | | Assignment/Exam Regrading Fee | $15.00 | | Faxing Back Assignments Fee | $2.00 | | Connectivity Fee | $36.00 | | Tuition | $405.00 | Materials| Course Guide, FPST 3733G | $30.00 | | Installation of Sprinkler Systems, NFPA 13 2007 | $75.25 |
The IS Office reserves the right to change course instructors, to revise courses and
change textbooks, to discontinue courses, and to adjust tuition and materials costs
as circumstances warrant and without notice
|